The 638 acres (2.58 km2) of land [We Build the Wall] built on is part of farmland that belongs to Neuhaus and Sons, and the wall added over $20 million in taxable land improvement, increasing the tax burden by 75 times. In January 2020, Fisher Industries started a lease-purchase agreement with Neuhaus and Sons for the land under the wall, but had not completed the ownership transfer by their court hearing on December 12, 2020, citing a problematic land survey by Fisher. Fisher’s attorney, Mark Courtois, was hopeful the US government would become owners of both the wall and land. U.S. Customs and Border Protection (CBP) Public Affairs Officer Thomas Gresback said that the wall was privately paid for and on private property, and CBP does not have anything to do with the project. CBP is constructing its RGV-03 project wall outside the floodplain 0.3 miles (0.48 km) away.[66] As of July 2021, the property had been reassessed at 100 times its original value, and Fisher was hoping to sell a 3-mile section of wall (4.8 km) that had cost $30 million to build.[67]

  • Dragonstaff
    link
    fedilink
    English
    arrow-up
    5
    arrow-down
    1
    ·
    2 months ago

    With no information, the blurb is almost designed to be infuriating. But remember that they didn’t just drop a wall there. We’re talking about grading and building roads for heavy equipment to get there, probably storage, and who knows what else. My money says that was the grift in the first place: scam Trump voters into paying to turn a worthless piece of land into something usable.